French Terry Construction

Ground and inlay yarn combinations set face, loop back, bulk and GSM; any raising plan must be known from the outset.

PRODUCTION INFORMATION · 16/50

Ground and inlay yarn combinations set face, loop back, bulk and GSM; any raising plan must be known from the outset.

Where does this affect production?

This parameter can affect material selection, machine settings, later processes and the finished garment. It should be reviewed with the fabric structure and intended use.

What should be recorded on the order form?

Record the target value, tolerance, test method, conditioning and approved sample reference on the order form. Ground yarn · Inlay yarn · Loop appearance · Target GSM

Sample and production approval

Technical suitability is checked first. A sample or pilot run is prepared when needed. Bulk production starts against the approved sample and order values.

Questions before ordering

  • What are the test method and acceptance tolerance?
  • Which record will be used to compare the sample and production lot?
  • How will correction and re-approval work if a result is outside tolerance?
Information to confirm

Capacity, certification, testing and performance information should be confirmed with the sales team for the product and order.